  • What is the title of the document issued by the Department of Environment and Natural Resources in the Philippines regarding land survey procedures?

    Manual on Land Survey Procedures
  • What is the purpose of the Manual on Land Survey Procedures?

    To provide guidance and compliance procedures for land surveys
  • What is the administrative order number associated with the Revised Regulations on Land Surveys?
    DENR Administrative Order No. 2007-29
  • What are the two classifications of control surveys as per the Manual?
    • Geodetic Control Surveys
    • Project Control Surveys
  • What system should Geodetic Control Surveys be conducted in?

    Philippine Reference System of 1992 (PRS 92)
  • What type of receivers are required for conducting Geodetic Control Surveys?

    Survey grade GNSS receivers
  • What must be done with the survey instruments before their use?
    Calibration/testing and registration
  • Who recommends the project area for Geodetic Control Surveys?

    The Regional Executive Director (RED)
  • Who must be authorized to conduct the Geodetic Control Survey?

    A qualified professional as per RA 8560
  • What document must be issued by the NAMRIA Administrator for a survey?

    Survey Order
  • What signals the start of survey activities for a contractor?
    A copy of the Contract with the Notice to Proceed
  • What are the three basic components of the Geodetic Control Survey Party?

    1. Project Main Office
    2. Survey Control Team
    3. Lot Survey Team
  • What must be included in the Geodetic Network Design?

    Old Project Control Points and new control points
  • Who has the right to inspect and supervise the operations of the survey team?
    The RED and/or the RTD for Lands
  • What are the stages of activities in a Cadastral Survey?

    1. Project Control Survey
    2. Political Boundary Survey
    3. Lot Surveys
  • What is the purpose of a Project Control Survey?

    To establish main and subsidiary controls over the cadastral project area
  • What does a Political Boundary Survey establish?

    Political boundary monuments defining boundary lines
  • What is the purpose of Lot Surveys?

    To determine individual lot boundaries for title acquisition
  • What must be done with cadastral maps and List of Claimants for lands not subject to private ownership?

    They are identified as Reservations, Forestland, etc.
  • When is a cadastral survey project considered in progress?

    From the issuance of Survey Order until final approval of survey returns
  • What accuracies must all Cadastral Survey Projects be conducted in?
    Accuracies required under Section 29, DAO No. 2007-29
  • Who issues cadastral survey project numbers?

    LMB (Land Management Bureau)
  • What instruments are required for Project Control and Municipal Boundary Survey?
    Instruments as per Section 21, DAO No. 2007-29
  • What is sufficient for conducting Barangay Boundary Survey and Lot Surveys?

    Use of ETS (Electronic Total Station)
  • What must be done if ETS instruments are used?

    Control survey must be conducted as per Section 45
  • What are the changes that may occur in the organization of the survey party during a cadastral survey?

    • Survey Control Team may serve as Lot Survey Team after approval
    • Reconnaissance Team may serve as Political Boundary Survey Team
    • Monument Setting Team may split into two groups for different tasks
  • What must be collated for data research and old monuments inventory?

    The list of approved surveys and their statuses
  • What must geodetic engineers submit within sixty days of an order for ongoing isolated surveys?

    A list of surveys in progress
  • What must be submitted to the concerned LMS for verification within four months?

    Field notes, computations, and sketches of isolated surveys
  • What happens if surveys are submitted after four months?

    They must be accompanied by a satisfactory explanation
  • What should the CENRO do upon approval of the survey contract?

    Cease issuing survey authority over parcels within the project
  • What should the Cadastral Survey Management Plan (CSMP) include?

    • Project Management Plan
    • Technical Plan (excluding gravity measurements)
    • Estimated area and number of lots
  • What are the preliminary activities in a cadastral survey project?
    1. Organization of Cadastral Survey Party
    2. Posting of general public notice
    3. Inauguration of Cadastral Survey Project
    4. Data research and information drive
  • What is the purpose of the general public notice in a cadastral survey?

    To inform the community about the survey project
  • What must the Geodetic Engineer/Contractor attach to the general notice?

    A certification of posting
  • Who must countersign the certification of posting?
    The Municipal/City Mayor and the Barangay Chairman
  • What are the two kinds of notices mentioned in the document?
    General notice and lot claimant’s notice
  • What is included in the General Public Notice?

    • Copies in Filipino, English, and local dialect
    • General information on the project
    • Distribution and posting in conspicuous places
    • Copies sent to barangay, municipal, and provincial authorities
  • Where should the General Public Notice be posted?

    In conspicuous places in the barangay and municipal building
  • What must the Geodetic Engineer/Contractor attach to the General Public Notice?

    A certification of posting