  • What is the administrative cost of the As based on?

    It is computed based on the cost per lot of the Cadastral Project.
  • What must be adopted as control monuments in the numerical cadastre?

    The control monuments in both the Project and the Political Boundary established in the Graphical Cadastre.
  • How should previously approved graphical cadastral lots be treated in the Cadastral Maps?

    They shall be reflected in the Cadastral Maps regardless of their title status.
  • What happens when a graphical lot is subdivided into multiple lots?

    One lot retains the original number, while others receive the highest number below it.
  • What activities compose the Pls Surveys Projects?

    Project Control Survey and Lot Surveys.
  • What is the purpose of Lot Surveys in Pls Surveys Projects?

    To determine individual lot boundaries and their corresponding area for title acquisition.
  • Are Political Boundary Surveys required for Pls projects covering only A&D lands?

    No, they are not required.
  • What must be observed and verified in Pls projects covering A&D lands?

    Established Political Boundary Monuments within the project coverage.
  • Who issues the Survey Order for survey projects?

    The concerned RTD for Lands.
  • What is the purpose of the Pls survey project numbers issued by the DENR LMS?

    To prevent duplication of numbers and indicate the Regional Code.
  • What survey instruments can be used for Project Control?

    Conventional type or GNSS Receivers.
  • What must be done before using any survey instruments?

    All survey instruments must be tested/calibrated and registered.
  • What changes may occur in the organization of the Survey Party during the Pls Survey?

    The Survey Control Team may become the Lot Survey Team after approval.
  • What provisions apply to Data Research and Old Monuments Inventory?

    The provisions of Section 33 of this Manual shall apply.
  • What should be collated for reference data in the project area?

    The list of approved surveys and their registration status.
  • What is included in the Pls Project Management Plan (PPMP)?

    The Project Management Plan and Technical Plan.
  • What is the basic scheme of work for a Pls survey project?

    It follows the activities of a Cadastral survey project, excluding Political Boundary Survey activities.
  • What provisions apply to the notification of survey?

    The provisions of Section 64 of this Manual shall apply.
  • What provisions must be followed in the conduct of Control Survey for Pls?

    The applicable provisions of Sections 29 to 52 of this Manual shall be followed.
  • What provisions apply to the conduct of lot sketching and setting of monuments?

    The applicable provisions of Sections 77 to 98 of this Manual shall apply.
  • What defines Pls as isolated survey under Section 5.c, DAO No. 2007-29?

    Areas involved that are 1,500 hectares and below.
  • What system shall Gss and Ts Surveys Projects be conducted in?

    In the PRS92 system.
  • How should the position of the lot’s boundary be determined for areas at least 1,500 hectares?

    Using GNSS Observations.
  • What is the minimum specification for determining lot corners in areas of at least 1,500 hectares?

    ETS must be used.
  • What is the required instrument for areas between 500 to 1,500 hectares?

    One-second (1”) optical or electronic theodolite with EDM.
  • What must be done with all survey instruments before use?

    They must undergo testing/calibration and registration.
  • What authority must Geodetic Engineers receive before undertaking Gss or Ts surveys?

    Authority issued by the concerned DENR Officials.
  • What must be researched by the Geodetic Engineer regarding adjoining claims?

    Approved surveys, their registration status, and reference points.
  • What should be determined regarding control or reference points during data research?

    Only stable or undisturbed control or reference points should be considered.
  • What should be included in the preliminary sketch of the lot?

    The names of the adjoining owners.
  • What must be verified before conducting a survey?

    The status of the monuments set on the ground must be verified.
  • What is the maximum distance for researching geodetic control points according to the manual?

    One kilometer or less
  • Why is it important to verify the status of monuments on the ground?

    To ascertain whether the monuments are intact or undisturbed
  • What coordinates must be determined for the geodetic control points?

    Geographic Position and Plane Coordinates (GPPC)
  • What type of control points should be considered for establishing control around the lot?

    Only stable or undisturbed control or reference points
  • Who validates and approves the PRS92-control points established in the area?

    NAMRIA
  • What should be included in the preliminary sketch of the lot?

    The names of the adjoining owners
  • What must be done before conducting a survey according to Section 119?

    A reconnaissance and validation of the sketch of the tract of land
  • What information must be indicated in the sketch before the survey?

    The names and addresses of all persons claiming ownership
  • What does Section 120 state about survey notification?

    It shall follow those stated in Section 7 of this Manual