Save
PROPERTY SURVEY
5,6,7,8
Save
Share
Learn
Content
Leaderboard
Share
Learn
Created by
Sarah Soriano
Visit profile
Cards (65)
What is the
administrative
cost of the
As
based on?
It is computed based on the cost per lot of the
Cadastral Project
.
View source
What must be adopted as
control monuments
in the
numerical cadastre
?
The control monuments in both the Project and the Political Boundary established in the
Graphical Cadastre
.
View source
How should previously approved
graphical cadastral lots
be treated in the
Cadastral Maps
?
They shall be reflected in the Cadastral Maps
regardless
of their title status.
View source
What happens when a
graphical
lot is
subdivided
into
multiple
lots?
One
lot retains the original number, while others receive the
highest
number below it.
View source
What activities compose the
Pls Surveys Projects
?
Project Control Survey
and
Lot Surveys
.
View source
What is the purpose of
Lot Surveys
in
Pls Surveys Projects
?
To determine individual lot boundaries and their corresponding area for
title acquisition
.
View source
Are
Political Boundary Surveys
required for
Pls
projects covering only
A&D
lands?
No, they are not required.
View source
What must be observed and verified in
Pls
projects covering A&D lands?
Established
Political Boundary Monuments
within the project coverage.
View source
Who issues the
Survey Order
for survey projects?
The concerned
RTD
for
Lands
.
View source
What is the purpose of the
Pls survey project
numbers issued by the
DENR LMS
?
To prevent duplication of numbers and indicate the
Regional Code
.
View source
What
survey instruments
can be used for
Project Control
?
Conventional type or
GNSS Receivers
.
View source
What must be done before using any
survey instruments
?
All survey instruments must be
tested/calibrated
and
registered
.
View source
What changes may occur in the organization of the
Survey Party
during the Pls Survey?
The
Survey Control Team
may become the
Lot Survey Team
after approval.
View source
What provisions apply to
Data Research
and
Old Monuments Inventory
?
The provisions of
Section 33
of this Manual shall apply.
View source
What should be
collated
for
reference data
in the project area?
The list of approved surveys and their
registration status
.
View source
What is included in the Pls
Project Management Plan
(
PPMP
)?
The Project Management Plan and
Technical Plan
.
View source
What is the basic scheme of work for a
Pls survey project
?
It follows the activities of a
Cadastral survey project
, excluding
Political Boundary Survey
activities.
View source
What
provisions
apply to the
notification
of survey?
The provisions of
Section 64
of this Manual shall apply.
View source
What provisions must be followed in the conduct of
Control Survey
for
Pls
?
The applicable provisions of
Sections 29 to 52
of this Manual shall be followed.
View source
What
provisions
apply to the conduct of lot sketching and setting of monuments?
The applicable provisions of
Sections
77 to 98 of this
Manual
shall apply.
View source
What defines
Pls
as isolated survey under
Section 5.c
,
DAO No. 2007-29
?
Areas involved that are
1,500
hectares and below.
View source
What system shall
Gss
and
Ts
Surveys Projects be conducted in?
In the
PRS92
system.
View source
How should the position of the lot’s boundary be determined for areas at least
1,500
hectares?
Using
GNSS
Observations.
View source
What is the
minimum specification
for determining lot corners in areas of at least
1,500 hectares
?
ETS
must be used.
View source
What is the
required
instrument
for areas between
500
to
1,500
hectares?
One-second
(1”)
optical
or
electronic
theodolite
with
EDM
.
View source
What must be done with all
survey instruments
before use?
They must undergo
testing/calibration
and
registration
.
View source
What authority must
Geodetic Engineers
receive before undertaking
Gss
or
Ts
surveys?
Authority issued by the concerned
DENR
Officials.
View source
What must be researched by the
Geodetic Engineer
regarding
adjoining claims
?
Approved surveys
, their
registration status
, and
reference points
.
View source
What should be determined regarding
control or reference points
during data research?
Only
stable
or
undisturbed
control or reference points should be considered.
View source
What should be included in the
preliminary sketch
of the lot?
The names of the
adjoining owners
.
View source
What must be
verified
before conducting a survey?
The status of the
monuments
set on the ground must be verified.
View source
What is the
maximum
distance for researching
geodetic control points
according to the manual?
One kilometer
or less
View source
Why is it important to verify the status of
monuments
on the ground?
To ascertain whether the monuments are
intact
or undisturbed
View source
What
coordinates
must be determined for the
geodetic
control points?
Geographic Position and Plane Coordinates (
GPPC
)
View source
What type of
control points
should be considered for establishing control around the lot?
Only
stable
or
undisturbed
control or
reference points
View source
Who validates and approves the
PRS92-control points
established in the area?
NAMRIA
View source
What should be included in the
preliminary sketch
of the lot?
The names of the
adjoining owners
View source
What must be done before conducting a survey according to
Section 119
?
A
reconnaissance
and validation of the sketch of the
tract of land
View source
What information must be indicated in the sketch before the
survey
?
The names and addresses of all persons claiming
ownership
View source
What does
Section 120
state about survey notification?
It shall follow those stated in
Section 7
of this Manual
View source
See all 65 cards