14-15

Cards (12)

  • What shall prevail in case of discrepancy in the survey data?

    The data in the approved survey shall prevail.
  • What should be noted on the plan if there are no improvements on the lot?
    The words “No Improvement” shall be noted correspondingly on the plan.
  • What are the provisions for conducting a topographic survey?

    • Use primary and secondary control stations and political boundary monuments.
    • Determine elevations using existing data or leveling from a benchmark.
    • Conduct surveys using altimeter or interpolation if elevation cannot be obtained accurately.
    • Leveling must start and close at BLLM No. 1.
    • Use transit and stadia, leveling, GPS, or plane table methods.
    • Follow procedures in standard surveying textbooks and specifications.
  • What is the designation for surveys not mentioned in the Manual?
    Special Work Order (Swo)
  • What procedures must be followed for mineral land surveys?

    They must follow the procedures and standards set by the Mines and Geosciences Bureau (MGB).
  • When can the conduct of forestland surveys proceed?

    After the enactment of the corresponding law by Congress.
  • Who should be part of the Survey Party for forestland surveys?
    Geodetic Engineers, members of the RADT, and a representative of NAMRIA.
  • What are the requirements for delimitation of forest boundary lines?

    • Issuance of Survey Order supported by law and corresponding maps.
    • Prior written notice to all claimants and concerned parties.
    • Conducted in the same manner as an isolated survey.
    • Reference to the Forestland, National Parks, Agricultural Land Boundary Map (FNPABM).
    • Survey must be at least in the 4th Order Accuracy.
  • What must be included in the survey returns of the Geodetic Control Survey?

    Copy of Required Certifications and other Legal Documents.
  • What documents are required in the Geodetic Control Survey returns?

    • Transmittal Letter signed and sealed by the Chief of Survey Party.
    • Project Contract.
    • Survey Order.
    • Approved Geodetic Control Work Plan.
    • Certificate of GPS Testing from NAMRIA.
  • What should the transmittal letter enumerate in the survey returns?

    The documents being submitted as part of the survey returns.
  • What information should be indicated in the Certificate of GPS Testing?

    The brand, model, serial number of GPS receiver and antennae used.