Save
PROPERTY SURVEY
14-15
Save
Share
Learn
Content
Leaderboard
Share
Learn
Created by
Sarah Soriano
Visit profile
Cards (12)
What shall prevail in case of
discrepancy
in the survey data?
The data in the
approved survey
shall prevail.
View source
What should be noted on the plan if there are no improvements on the lot?
The words
“No Improvement”
shall be noted
correspondingly
on the plan.
View source
What are the provisions for conducting a
topographic survey
?
Use
primary and secondary control stations
and
political boundary monuments
.
Determine elevations using existing data or
leveling
from a benchmark.
Conduct surveys using altimeter or interpolation if elevation cannot be obtained accurately.
Leveling must start and close at
BLLM No. 1
.
Use
transit and stadia
, leveling,
GPS
, or
plane table
methods.
Follow procedures in standard surveying textbooks and specifications.
View source
What is the designation for surveys not mentioned in the Manual?
Special Work Order
(
Swo
)
View source
What
procedures
must be followed for mineral land surveys?
They must follow the procedures and standards set by the
Mines and Geosciences Bureau
(MGB).
View source
When can the
conduct of forestland surveys
proceed?
After the
enactment
of the corresponding law by
Congress
.
View source
Who should be part of the Survey Party for forestland surveys?
Geodetic Engineers
, members of the
RADT
, and a representative of
NAMRIA
.
View source
What are the requirements for
delimitation
of forest boundary lines?
Issuance of
Survey Order
supported by law and corresponding maps.
Prior written notice to all
claimants
and concerned parties.
Conducted in the same manner as an isolated survey.
Reference to the Forestland, National Parks, Agricultural Land Boundary Map (
FNPABM
).
Survey must be at least in the
4th Order Accuracy
.
View source
What must be included in the survey returns of the
Geodetic Control Survey
?
Copy of
Required Certifications
and other
Legal Documents
.
View source
What documents are required in the
Geodetic Control Survey
returns?
Transmittal Letter
signed and sealed by the
Chief of Survey Party
.
Project Contract.
Survey Order.
Approved Geodetic Control Work Plan.
Certificate of GPS Testing from
NAMRIA
.
View source
What should the
transmittal letter
enumerate
in the
survey returns
?
The documents being submitted as part of the survey returns.
View source
What information should be indicated in the
Certificate of GPS Testing
?
The brand, model,
serial number
of
GPS receiver
and
antennae
used.
View source