18-19

Cards (75)

  • What is the title of Chapter V in the document?
    Chapter V - Cadastral Survey Returns
  • What is Article 18 about in the document?
    Numerical Cadastral Survey Returns
  • What forms part of the survey returns for Cadastral Survey?
    A copy of the Required Certifications and other Legal Documents
  • How many hardbound copies of the Final Report are required?
    Three hardbound copies
  • What should the Final Report be prepared on?
    Standard size bond paper (double spaced)
  • What is included in the first part of the Project Profile?
    Geographical location
  • What information is required under the geographical location section?
    Name of locality and important natural features
  • What demographic information should be included in the Project Profile?
    Approximate number of inhabitants and statistics on births and deaths
  • What historical information is required in the Project Profile?
    Important historical events, places, and monuments
  • What government-related information should be included in the Project Profile?
    Organization of local government and names of local officials
  • What commerce and industry information is required in the Project Profile?
    Industrial and commercial enterprises
  • What does the second part of the Final Report cover?
    The inauguration of the survey
  • What should be documented during the inauguration of the survey?
    Authority and order of survey, dialogues with officials, and inauguration ceremonies
  • What is included in the third part of the Final Report?
    The survey process and local conditions encountered
  • What should be analyzed in the survey section of the Final Report?
    Results of the work and conditions influencing surveying operations
  • What does the fourth part of the Final Report address?

    Land questions including ownership and tenurial structure
  • What information is included in the fifth part of the Final Report?
    Party administration details including organization and staffing
  • What summary statistics should be included in the party administration section?
    Number of barangays, total number of lots, and aggregate area
  • What is the Cadastral Survey Management Plan (CSMP)?

    A plan described in Section 62 of the Manual
  • What certification is required as per Annex X.A and B?
    Certification of public notice
  • What is required for individual lot claimants as per Annex XI.A and B?
    Certification of notice to the individual lot claimants
  • What should be included in the report on land applications?
    Report on all public, government, and mineral land applications
  • What is the purpose of the Geodetic Engineer’s Certificate?
    To certify the cadastral survey and its details
  • What should the Geodetic Engineer’s Certificate contain?
    Names of claimants of adjoining parcels and notification details
  • What is required in the report on previous surveys?
    Technical description, status, and assigned cadastral lot number
  • What should be included in the list of unclaimed lots?
    Technical description, status, and assigned cadastral lot number
  • What information is required for public, government, and mineral land claims?
    Technical description, status, and assigned cadastral lot number
  • What should be included in the list of foreshore lands?
    Technical description of previously approved surveys
  • What field notes are required for the survey?

    Reference book for primary stations and lot survey books
  • What computations are required for the survey control?
    Main and subsidiary control computations
  • What should be included in the mapping materials?
    Maps prepared on reproducible material of stable base
  • What is the scale for Project Control Maps?
    1. 4000 on a stable base drafting material
  • What should the progress map indicate?
    Approximate distance of the project from the poblacion and accessible transportation points
  • What should the progress map contain regarding work accomplished?
    A table showing the total for each class of work accomplished for each month
  • What details should be shown on the cadastral map?
    Names of claimants, numbers of concrete monuments, and lot corner descriptions
  • How should adjoining unsurveyed parcels be numbered on the cadastral map?
    Assigned consecutive numbers beginning from 1 preceded by the letter “A”
  • What should be indicated on the cadastral map for previously patented lots?
    The relationship of the lot to the previous survey
  • What should be plotted on the cadastral map regarding control stations?
    Control station plotted by coordinates and side shots taken
  • What should be done when two adjoining cadastral projects are in progress?
    The cadastral map showing their common boundaries should be plotted first
  • What is the system of numbering cadastral maps based on?
    The extreme west and east meridians and the stream south and north parallels