Cards (14)

    • What is hard engineering management in flood management?
      Using artificial structures, such as dams and embankments
    • What is soft engineering management in flood management?
      A more natural approach to manage flooding, such as flood plain zoning
    • What are the two main types of flood management strategies?
      • Hard engineering management
      • Soft engineering management
    • What does a hydrograph show?
      How a river responds to a period of rainfall
    • What is peak discharge?
      The volume of water in a river passing a point in a given time
    • In what units is peak discharge measured?
      In cumecs (cubic metres per second)
    • What is peak rainfall?
      The maximum amount of rainfall measured in millimeters
    • What is lag time in the context of a hydrograph?
      The time taken between peak rainfall and peak discharge
    • What does the rising limb of a hydrograph represent?
      The increase in discharge on a hydrograph
    • What does the falling limb of a hydrograph indicate?
      The return of discharge to normal/base flow on a hydrograph
    • What is base flow in a river?
      The normal discharge of the river
    • How does vegetation affect lag time?
      Vegetation can increase lag time by intercepting rainfall
    • What factors influence lag time?
      Size of the drainage basin, vegetation, valley side steepness, and soil type
    • What are the factors influencing lag time in a hydrograph?
      • Size of the drainage basin
      • Vegetation
      • Valley side steepness
      • Soil type