Cards (18)

    • how long is river
      165km
    • floodplain
      5km
    • when was river channelised
      1960s
    • dredged a ... deep channel
      30 foot
    • engineering changes
      1962-71
    • transformed into a
      90km, 10m deep drainage canal
    • how much floodplain wetlands drained by building of canal
      2/3
    • how much river restored
      100km
    • started and completed
      started 1999
      completed 2015
    • benefits how much wildlife species
      320
    • how much wetlands created
      11,000 hectares
    • how long does water stay in drainage basin for during a flood
      1 day
      previously 11 days
    • precanal average flow
      0.05 m/s
    • wetland loss
      14000 hectares
    • reduction in wading birds
      90%
    • navigable depths maintained
      90%
    • cost
      400m
    • initial channelisation cost
      20m
    See similar decks