Cheonggyecheon river restoration project

Cards (28)

  • When did the Cheonggyecheon river project start?
    2003
  • How long did the Cheonggyecheon river project take to complete?
    2 years and 3 months
  • What was one major reason for initiating the Cheonggyecheon river project?
    Large amounts of pollution in the area
  • What safety concern was associated with the elevated overpass?
    It was deteriorated and degraded, making it unsafe
  • Why was the water quality poor in the Cheonggyecheon area?
    Due to the shanty town built around it
  • What was one of the overall aims of the Cheonggyecheon river project?
    To improve the quality of life in Seoul
  • How long was the area restored in the Cheonggyecheon river project?
    5.8 km long
  • What was the cost of the Cheonggyecheon river project?
    $281 million
  • What features were included in the Cheonggyecheon river project scheme?
    • Car use discouraged
    • 22 bridges added (12 pedestrian)
    • Hanging river used to reduce water pollution
    • Middle zone features fountains and waterfalls
    • End of river flows into conservation wetland
  • What role did the citizens committee play in the Cheonggyecheon river project?
    They gauged public opinion and concerns
  • How did local businesses react to the Cheonggyecheon river project?
    They saw it as a threat to livelihood
  • What was the South Korean president's attitude towards the Cheonggyecheon river project?
    He had a positive attitude towards the scheme
  • How did the Cheonggyecheon river project impact flow rates?
    Maintained a constant rate of 120,000 tons daily
  • What flood protection capability does the Cheonggyecheon river project provide?
    Protection for up to a 200-year flood event
  • By what percentage did biodiversity increase between 2003 and 2008?
    639%
  • How many plant species were recorded before and after the project?
    From 62 to 308 species
  • How many fish species were recorded before and after the project?
    From 4 to 25 species
  • What was the reduction in average air temperature due to the project?
    By 2.5 degrees Celsius
  • What effect did the project have on the urban heat island effect?
    It reduced the urban heat island effect
  • How did evapotranspiration rates change after the project?
    Evapotranspiration rates increased
  • What alteration was made to the inputs of the system in the Cheonggyecheon project?
    Added water from Han River and rainwater
  • How was the biological oxygen supply improved in the Cheonggyecheon project?
    Via small waterfalls
  • What were the environmental impacts of the Cheonggyecheon river project?
    • Increased overall biodiversity
    • Flood protection for up to a 200-year flood event
    • Reduced urban heat island effect
    • Reduced small particle air pollution by 35%
  • What were the social impacts of the Cheonggyecheon river project?
    • 18.1 million visitors by 2008
    • Foreign tourists contributed 2.1 billion won
    • Reduced respiratory disease risk for residents
  • What were the economic impacts of the Cheonggyecheon river project?
    • Increased land prices by 30-50%
    • Increased number of businesses by 3.5%
    • Investment into residential construction
  • What was a limitation of the inclusive design in the Cheonggyecheon project?
    Limited consideration of certain user groups
  • What action was taken in response to the protest for access to pathways?
    Lifts were provided at 7 locations
  • What issue remained despite the provision of lifts in the Cheonggyecheon project?
    Irregular surface made wheelchair use uncomfortable