o In 2020, Ethiopia finished building the grand Ethiopian renaissance dam which is used for HEP and to control the flow of the river to prevent flooding or drought, however Egypt had concerns over this, as large volumes of water are vulnerable to evaporation, meaning their water supply may be at risk leading to disputes