Uneven and Sloping ground

Cards (10)

  • On a designated uneven and Sloping terrain' measure 50m and mak the ends.
    1
  • Measure 10m from the first station to the next one and do this repeatedly until it reaches the end of the line.
    2
  • Plumb the rod in the first station and measure 1m from the ground. This will serve as the reference point.
    3
  • At the first station' tie a nylon string to the 1m markings of the rod.
    4
  • Tie it to the next station
    5
  • Level the nylon string from both stations with the use of spirit level.
    6
  • Measure the rod of the second station starting from the ground and ending at the point where the nylon string is tied.
    7
  • Record the data gathered at the first station.
    8
  • Do the procedures on the remaining stations.
    9
  • Compute the recorded data.
    10