Save
M3 FINALS
Uneven and Sloping ground
Save
Share
Learn
Content
Leaderboard
Learn
Created by
Antonette Palad
Visit profile
Cards (10)
On a designated uneven and Sloping terrain' measure 50m and mak the ends.
1
Measure 10m from the first station to the next one and do this repeatedly until it reaches the end of the line.
2
Plumb the rod in the first station and measure 1m from the ground. This will serve as the reference point.
3
At the first station' tie a nylon string to the 1m markings of the rod.
4
Tie it to the next station
5
Level the nylon string from both stations with the use of spirit level.
6
Measure the rod of the second station starting from the ground and ending at the point where the nylon string is tied.
7
Record the data gathered at the first station.
8
Do the procedures on the remaining stations.
9
Compute the recorded data.
10