Pickering beck

    Cards (14)

    • Location
      North Yorkshire Moors
    • Pickering population
      7000
    • Pickering beck is a tributary of the river ____
      Derwent
    • Natural causes of flooding in Pickering
      Steep valley side
      Flat valley floor
      Lots of tributaries add water to the main river. (Gundale beck)
    • In which years did Pickering town centre flood
      1999, 2000,2002, 2007
    • In 2007____ properties were destroyed
      85
    • The 2007 flood affected the whole of Yorkshire and the damage cost £_____
      £ 2.1 billion
    • Human activities effecting flooding
      - Urbanisation (town and road)
      - Farming has resulted in overgrazing so land wont infiltrate water
      - Climate change creates wetter winters
    • What road runs through Pickering
      A170
    • Flood management scheme is called
      Slowwwinggg the flowwww
    • flood management techniques
      Low level bunds
      Afforestation - hydrophilic plants like willow that infiltrate a lot
      Moorland drains have been blocked to encourage natural storage within the moors
    • what is the purpose of the low level bunds in the scheme
      water can be stored in the upper catchment until discharge decreases
    • How wide are the strips of willow planted on either side of the beck
      30m
    • what does blocking moorland drains achieve
      they have been blocked with heather bales to encourage natural storage within the moorland, reducing the flow to the beck.
    See similar decks