Cards (5)

  • How can we avoid landslide tragedies?
    1. proper geohazard assessment
    2. geotechnical investigation
    3. slope stability analysis
    4. landslide instrumentation monitoring
  • MRT 7
    What is this rig doing?
    • drilling bored piles to transmit super structure loads to the hard competent strata
  • Deep Excavation
    How to stabilize vertical excavation?
    1. geotechnical investigation
    2. slope stability analysis
    3. soil nails and shotcrete
  • Mega Manila Subway
    How to make a subway in a highly populated city?
    • tunnel boring machine
  • Reclamation Project
    How to reclaim land and build high rise buildings?
    1. geotechnical investigation
    2. engineered backfill
    3. piles
    4. ground improvement