Save
FCE
Save
Share
Learn
Content
Leaderboard
Learn
Created by
Kasia
Visit profile
Subdecks (1)
2
FCE
67 cards
Cards (94)
factors influencing
depth
of foundation:
min. depth
neighbouring buildings
frezzing zone
depth of load bearing capacity of soil
functional requirements
factors influencing HYDROINSULATION: (4)
permability
of
water
ability
to
connect
durability elonagtion
Division of walls:
stiffening walls
structural walls
homogeneous walls
external walls
structural
infill
purlin
płatew
Types of ceelings:
beams
gęstożebrowe
-
densely ribbed
płytowo-żebrowe
płytowe.
horizontal dilatation
for
acoustic insulation
separated with elastic layers
cracks in external walls of buildings, at corners of windows
non-homogenous soil under the structure
types of wood connections
jaskółka
tongue and grove
overlap
(
cheap
)
hydroinsulation types
light-weight
(
1
layer
)
medium-weight (2 layers
)
heavy-weight
(
3 layers
)
rozstaw belek w stropach stalowych (2)
przy wypełnineiu płytkami ceramicznymi 120-150
cm
przy użyciu płyt żelbetowych ok. 150
angle
of reporse
silt 19
gravel
25-30
sandy clay 15
angle of reporse for excavation
30
medium hydro.
water contact, no water pressure
heavy hydro.
water pressure
3
layers of bitumen on paper
lightweight hydro.
1 layer
of bitumen enclosed with
2 layer
of paper
usually
vapour insulation
permable ground and water effects
GWL below foundation
+ heavy rain
GWL can shift to higher level
how to improve permability of ground
add pipe at the middle of foundation foot
below the lowest level of HORIZONTAL hydroinsulation in the foundation
Static load types
load of construction elements
own load
changeable loads types
dynamic loads
(
wind
,
thermal
)
snow load
machines
in
storage
direct
foundations
:
strip
foundation (ława)
foot foundations
plate
ruszty fundamentowe
indirect foundation:
studnie fundamentowe
piles {pale fundamentowe
kiedy dajemy dylatacje
kiedy możemy spodziewać sie nie równego osiadania budynku
with very big differences in buildings weight
studnie fundamentowe głębokość:
do 60 cm diameter
głębokość do 40 metrów
ile można obniżyć poziom posadowienia
max. 1 metr
ways of attaching thermal insulation to the structural wall:
hooks
glue
anchors
mineral woold with discs and rendres
triple layer wall (layers):
bricks
thermal
structural
condensation in thermal layerv moisture cannot escape
thermal attached witha anchors
See all 94 cards