1. Take vital signs and assess patient's condition
2. Explain the procedure to patient or watcher
3. Wash your hand and assemble all equipment and bring to bedside
4. Close doors and windows in private rooms and draw curtains in the ward. Put off air conditioner and electric fans
5. Adjust the bed to the working height
6. Don gloves. Lay the waterproof underpad
7. Change the topsheet with a bath blanket and remove patients clothing
8. Pour/ Mix water in a basin with the temperature of 27-37˚C (80-98˚F). Immerse 6 washcloths to the basin
9. Apply rolled washcloths to axillae and groin. Apply one on the head
10. Gently pat the wash cloth on the patient's face, neck extremities, back and buttocks. The whole procedure should last for 30 minutes
11. Pat dry with bath towel each body part after sponging cover it with the bath blanket
12. Monitor the patient's reaction to treatment and recheck TPR after 15 minutes and after completing the bath.Discontinue procedure if 1-2˚F above desired level is obtained
13. Remove washcloths from axillae and groins and pat dry the areas. Change the patients clothing and replace the bath blanket with the topsheet
15. Do the after care of equipment used
16. Document the treatment performed, patients VS, response to the treatment and any complications