Contractor

Cards (303)

  • In a sleeping room what is the maximum height of a window sill measured from the top of the finished floor to the top of the window sill:
    44”
  • Working scaffold platforms should be kept at what maximum distance from a wall being plastered and lathed:
    18”
  • If installing board and batten siding, how is the batten attached:
    Nailed into the stud of substrate below only
  • If using screws or pins to attach A non-load bearing steel stud to a concrete floor, what Is the maximum distance from each end of the track for a fastener:
    2”
  • When Is type lll cement used:
    during cold weather when early strength is needed
  • Which of the following cannot be used for eye protection:
    Regular glasses with thick plastic frames
  • Type X Sheetrock has a rating that is based on:
    fire resistance
  • How is the width of a door jamb determined:
    from the outside of outer wall To inside of inner wall
  • What is the actual size of a finished 2 x 6:
    1 1/2” x 5 1/2”
  • What is the correct moisture barrier under a concrete floor:
    6mil lapped 6”
  • Which of the following would be the correct way to frame a 5‘ x 5’ stair opening through a floor:
    double the header and trimmer joists
  • A week or so after concrete is placed a powdery substance appears on the surface indicating:
    Overworking the concrete when placing
  • All exterior concrete footings must be placed at what distance below un disturbed ground surface and below the frostline:
    12”
  • If joining two studs to make a box connection how much of an overlap do you provide:
    6”
  • Which of the following statements about vibratory settlement of concrete is correct:
    A stiffer batch may be used
  • What type soil is used for backfilling a basement wall:
    same as soil used for footer
  • How far from the block should the level string be located when placing a masonry wall:
    1/16”
  • What is the minimum distance from finished grade to the top of the concrete footing for a wood framed house:
    8”
  • What is first done when installing base cabinets in a kitchen:
    find floor high spots
  • What is the minimum slope on which metal tiles can be applied to a roof:
    December 30, 1899 3:12:00 AM -0500
  • What is the actual dimension of a 2 x 4
    1 1/2 x 3 1/2
  • When working in a trench or a hole without water protection, what is the maximum amount of water allowed to collect in the bottom:
    0”
  • The backset for a door lock is centered how far back from the edge of the door:
    2 3/8
  • Batter boards are required to be placed how far from the edge of the footer:
    4’
  • What is the structural part of a stair step that carriers the load:
    Stringer
  • What formula is used if combustible materials project out from the face of a fireplace opening, to determine how far away from the opening they may be applied:
    for every 1/8” projection, set back an additional inch
  • Underlayment for asphalt roofing in high winds areas must be fastened with fasteners at what maximum centers:
    36”
  • Where is the starting point for setting a parque tile floor:
    In the middle of the room
  • Footer anchor bolts must be embedded by what minimum amount:
    7”
  • What controls the strength of concrete as it cures:
    Controlled water loss
  • What is the minimum compressive strength for a concrete driveway with moderate exposure:
    3000
  • What is the maximum slope For a wheelchair ramp:
    1:12”
  • The correct compaction of sand requires:
    correct moisture
  • At what minimum distance from the structure must combustible material be stored:
    20’
  • What kind of interior door requires the track to be installed during the framing process:
    Pocket
  • What is maximum deviation in height for stair risers:
    3/8”
  • What if the minimum clear width of an egress door:
    32”
  • What ASTM standard controls the use of polyurethane insulation:
    C1029
  • When is the bottom plate of framing cut out for any door opening:
    after sanding, attaching and bracing the wall
  • What are the parts of a ballustrade:
    Handrails,ballusters, newels