The Lesotho highlands water project (large scale)

Cards (9)

  • Lesotho
    • Highland country
    • Surrounded by South Africa
    • Heavily dependent economically on South Africa
  • Despite food insecurity, Lesotho has a water surplus mainly due to high rainfall in its mountainous regions
  • Lesotho Highland Water Project
    A huge water transfer scheme aimed to help solve the water shortage in South Africa
  • Lesotho Highland Water Project
    1. Construction of dams
    2. Reservoirs
    3. Pipelines
    4. Roads
    5. Bridges
    6. Other infrastructure
  • 40% of the water from the Segu (Orange) River in Lesotho will eventually be transferred to the River Vaal in South Africa
  • Advantages of the Lesotho Highland Water Project for Lesotho
    • Provides 75% of Lesotho's GDP
    • Supplies all Lesotho's hydro-electric (HEP) requirements
    • Sanitation coverage will increase from 15 to 20%
  • Disadvantages of the Lesotho Highland Water Project for Lesotho
    • Building the first two dams displaced 30000 people
    • Destruction of a unique wetland ecosystem
    • Corruption has prevented money reaching those affected by the construction
  • Advantages of the Lesotho Highland Water Project for South Africa
    • Provides water to an area with regular droughts
    • Fresh water reduces the acidity of the Vaal River Reservoir
    • Provides safe water to an extra 10% of the population
  • Disadvantages of the Lesotho Highland Water Project for South Africa
    • Costs are likely to reach US$4 billion
    • 40% of water is lost through leakages
    • Corruption has plagued the whole project