Engineering strategies

    Cards (10)

    • Hard engineering

      Man made structure to control flow and reduce flooding
    • soft engineering

      schemes using knowledge of river and its processes to reduce effects
    • h- dams and reservoirs
      -barriers built across rivers
      —reservoir (artificial lake) forms behind
      +reservoirs store water, control flow, and prevent floods downstream
      +can generate hydroelectric power
      -expensive
      —reservoir can flood existing settlements
      -material deposited so farmland less fertile
    • h- channel straightening
      -meanders removed by building artificial channels
      + water leaves area faster
      -flooding downstream, fast moving water may cause erosion
    • h- embankments
      -raised walls built along river banks
      +river holds more water
      -expensive and risk of severe flooding if break or rise above
    • h- flood relief channels
      -divert water around built up areas or if level gets too high
      +gates control water
      -increased discharge where channel joins river, could cause flooding
    • s- flood warnings and preparation
      environment agency issues flood warnings through media allowing
      .buildings to be modified to minimise damge
      .prepare sandbags and flood boards
      +time to move possessions/ evacuate
      -don't prevent floods, some cant access warnings
      -can be expensive
      -gives false sense of security
    • s- flood plain zoning
      restrictions prevent building on certain parts of plain
      + impact reduced, less to damage
      -expansion of urban areas limited
      -cant help existing areas
    • s- planting trees
      increases interception of water and lag time
      +discharge and flood risk decrease
      + reduces soil erosion and provides habitats
      -less land for farming
    • s- river restoration
      making river more natural so plain can flood naturally
      +discharge reduced, less risk of flooding downstream
      + little maintenance needed and better habitats
      -local flood risk can increase
    See similar decks